THE GILLARD COMPANY

Our infrastructure

Equipment and tools

  • 1 Welding robot 15m x 7m
  • 1 welding robot 15 m x 3 m
  • 8 Commercial cars
  • 6 Vans and workshop trucks
  • 1 Hand truck for transporting compactors
  • 1 Hand truck with crane
  • 2 paint booths
  • 5 Forklifts (from 5 to 15 Tons)
  • 9 Overhead cranes (5 to 10 Tons)
  • 1 Conventional tower
  • 1 Conventional milling machine
  • 1 Guillotine
  • 1 Press
  • 1 Rolling machine
  • 28 Welding machines (semi-automatic)
  • 2 CAD stations

Workforce

47 people

Area covered

7000 m²

Land area

2 hectares

The head office and the main factory are located in Bois le Roi (Seine et Marne)

Head office and main factory
Gillard building waste disposal
Home
Assembly hall and warehouse 1600m².
Boilermaking workshop 1500m².
Maintenance workshop 1200m².
900m² storage hall
Paint booth

Secondary plant dedicated to the production of removable skips (1600m²)